Field Fixes and Solutions
What do you do when an anchor rod hole is misplaced? Or the columns aren't plumb? More importantly, what can you do to prevent these problems from occurring in the first place? This session covers a wide range of topics and provides the tools and knowledge to not only fix, but also to potentially prevent these field problems. Unlike other webinars or seminars this one is more philosophical than technical in nature based upon many years of practical experience. Topics include:
- What to do when notified about a field problem
- Anchor rods
- Columns and beams
- Reinforcing members and connections
- Fit-up problems
- Member selection guidelines
This presentation was given as the seventh of eight sessions of Night School 18: Steel Construction: From the Mill to Topping Out. You can find other sessions from this Night School in the Education Archives at the following links.
- Session 1: Introduction to the Steel Construction Process: The Team Behind the Building
- Session 2: The Manufacturing of Structural Steel Shapes
- Session 3: Steel Fabrication: A Virtual, Detailed Tour of the Steel Fabrication Process
- Session 4: Connection Design as the Fabricator's Representative
- Session 5: It Doesn't Get Built Without the Erector
- Session 6: Erection Engineering: Stability During Construction
- Session 8: Quality Control and Quality Assurance
You must purchase and pass a quiz to receive a PDH certificate for this course.
- Date: 12/3/2018
- Duration: 1.5 Hours
- PDH Credits: 1.5
Speaker(s)
James M. Fisher, PhD, PE, Dist.M.ASCE
Videos
Handouts
Field Fixes and Solutions Handouts - 2 per page
Field Fixes and Solutions Handouts - 4 per page