Continuing Education

Case Studies in Construction Engineering of New and Existing Complex Steel Bridges

This session will discuss several case studies focusing on the detailing; fabrication and erection of complex; steel bridges. The challenges associated with various construction methods and how they were addressed will also be presented. This session will also include a discussion of the detailed removal and replacement procedure for truss pins in the US 84 Mississippi River Bridge.
  • Date: 4/13/2016 - 10/20/2016
  • PDH Credits: 0

Speaker

Andrew Keaschall; James Gregg; Bob Cisneros

View content here.