Continuing Education
Case Study of Daily's Place at EverBank Field [Y5]
This significant steel project posed incredible challenges with geometry, tensioned fabric integration and an extremely compressed design and construction schedule. The Design Team (Lead by Populous) and Hunt-Danis (CM) chose an integrated steel delivery method to help compress schedule while at the same time minimize potential change orders and field work. To realize this integration WPM (EOR) and BDS (Tekla/Detailing) delivered a fully-connected Tekla model for the primary and secondary long-span roof steel to Hunt-Danis prior to the selection of Banker Steel (Fabricator). The Banker Steel team also consisted of Midwest Steel (Erector), Ruby+Associates (Erection Engineer) and LTC (Detailer). The Roof and Wall Fabric supplier and installer is StructureFlex LLC who also hired WPM as their Fabric EOR on the construction side of the team. The session panel will walk participants through the integrated design, procurement and construction of the primary steel structure that resulted in a project completed in record time with minimal change orders.
Intended Audience: Engineers, Fabricators, Erectors, Detailers, Architects
Track: Case Study
- Date: 4/11/2018 - 4/13/2018
- PDH Credits: 0
SPEAKER(S)
Randall Braun, PE; Stephen Blumenbaum, PE; Kevin Rogers; John Callahan