Connection Design Efficiency Loss [D4]

Many projects with delegated connection design responsibilities hit roadblocks that derail the schedule early in detailing process. This forces the delegated connection design engineer to send RFIs requesting essential information from the EOR so they can complete their design--which in turn delays the detailing schedule and possibly the project. The end result is a project that is behind schedule with significant efficiency loss. The concept of a pre-detailing conference, which can help avoid these types of issues, is presented in this session.


Intended Audience: Detailers, Engineers, Erectors, Fabricators
Track:Detailing