Continuing Education


SpeedCore: Rainier Square -- A Project Case Study

This webinar will review the design and construction aspects of the first high-rise in a seismically active zone in the U.S. to utilize a concrete-filled composite plate shear wall system, also known as SpeedCore. The benefits of a SpeedCore system will be highlighted by reviewing a project case study recently topped out in Seattle, Washington – Rainier Square. Benefits included construction schedule reduction, overall project cost savings, tighter tolerance through pre-fabrication, to name a few. In addition to the project case study, recent advancements in ongoing research and testing as well as upcoming code modification proposals will be presented.

This is the SteelDay 2019 webinar!  Registration is free!

Register
  • Date: 9/27/2019
  • Time: 1:30 p.m. - 2:30 p.m. EDT
  • Duration: 1 hour
  • Location: Live Webinar
  • PDH Credits: 1
  • Cost:

    FREE!

    Only one person from your organization is required to register per connection.  Each individual within your organization who attends at the registered connection will receive a PDH certificate at no additional charge.

  • Registration Deadline: 9/27/2019 10:00 a.m.
  • Connection Instructions: Upon registration, you will receive a confirmation email containing your receipt, a link to access the webinar, dial-in audio instructions, and a link to a PDF handout of slides.

Speaker

Brian G. Morgen

Brian Morgen

Brian G. Morgen, PhD, PE, SE, LEED AP is a Principal at Magnusson Klemencic Associates, a consulting structural and civil engineering firm in Seattle, Washington.