Estero Parkway
Prize Bridge Information
- Year Awarded: 2012
- Year Completed: 2009
- Location: Estero, FL
- Award Class: Long Span
- Designer/EOR: Zep Construction, Inc.
- Fabricator: FINLEY ENGINEERING GROUP
- Owner: V & M Erectors, Inc.
- General Contractor: Tampa Steel Erecting Company
- Detailer: Lee C ounty D.O.T.
Structure Information
- Structure Type: Tub Girder
- Coating System: Paint
- Span Length (ft): 332/227
- Structure Length (ft): 559
- Average Deck Width (ft): 116.6667
- Steel Weight/Deck Area (lb/ft²): 69.69
- Amount of Steel (tons): 2278
- Cost: $35.1 million