National Steel Bridge Alliance

Hastings High Bridge

Prize Bridge Information

  • Year Awarded: 2016
  • Year Completed: 2013
  • Location: Hastings, MN
  • Award Class: Major Span
  • Designer/EOR: Parsons
  • Fabricator: Veritas Steel
  • Owner: Minnesota DOT
  • General Contractor: Lunda Construction Company
  • Detailer: Candraft Detailing

Structure Information

  • Structure Type: Arch
  • Coating System: Paint
  • Span Length (ft): 545 Main Span
  • Structure Length (ft): 1938
  • Average Deck Width (ft): 104
  • Steel Weight/Deck Area (lb/ft²): 90
  • Amount of Steel (tons): 2560
  • Cost: $130 million