National Steel Bridge Alliance
Hastings High Bridge
Prize Bridge Information
- Year Awarded: 2016
- Year Completed: 2013
- Location: Hastings, MN
- Award Class: Major Span
- Designer/EOR: Parsons
- Fabricator: Veritas Steel
- Owner: Minnesota DOT
- General Contractor: Lunda Construction Company
- Detailer: Candraft Detailing
Structure Information
- Structure Type: Arch
- Coating System: Paint
- Span Length (ft): 545 Main Span
- Structure Length (ft): 1938
- Average Deck Width (ft): 104
- Steel Weight/Deck Area (lb/ft²): 90
- Amount of Steel (tons): 2560
- Cost: $130 million