National Steel Bridge Alliance

Leonard P. Zakim Bunker Hill Bridge

Prize Bridge Information

  • Year Awarded: 2003
  • Year Completed: 2003
  • Location: Boston, MA
  • Award Class: Major Span

Structure Information

  • Structure Type: Cable Stayed
  • Coating System: Paint
  • Span Length (ft): 112/130/745/250/170
  • Structure Length (ft): 1407
  • Average Deck Width (ft): 183
  • Steel Weight/Deck Area (lb/ft²): 50
  • Amount of Steel (tons): 3000
  • Cost: $100 million