National Steel Bridge Alliance

MacArthur Maze Ramp (Reconstruction)

Prize Bridge Information

  • Year Awarded: 2009
  • Year Completed: 2007
  • Location: Oakland, CA
  • Award Class: Reconstructed
  • Designer/EOR: California Department of Transportation
  • Fabricator: Stinger Welding, Inc.
  • Owner: California Department of Transportation
  • General Contractor: C.C. Myers, Inc.
  • Architect: California Department of Transportation

Structure Information

  • Structure Type: Plate Girder
  • Coating System: Paint
  • Span Length (ft): 77.6/83.7
  • Structure Length (ft): 161.3
  • Average Deck Width (ft): 45
  • Steel Weight/Deck Area (lb/ft²): 37.8
  • Amount of Steel (tons): 100
  • Cost: $5.867 million