National Steel Bridge Alliance
MacArthur Maze Ramp (Reconstruction)
Prize Bridge Information
- Year Awarded: 2009
- Year Completed: 2007
- Location: Oakland, CA
- Award Class: Reconstructed
- Designer/EOR: California Department of Transportation
- Fabricator: Stinger Welding, Inc.
- Owner: California Department of Transportation
- General Contractor: C.C. Myers, Inc.
- Architect: California Department of Transportation
Structure Information
- Structure Type: Plate Girder
- Coating System: Paint
- Span Length (ft): 77.6/83.7
- Structure Length (ft): 161.3
- Average Deck Width (ft): 45
- Steel Weight/Deck Area (lb/ft²): 37.8
- Amount of Steel (tons): 100
- Cost: $5.867 million