National Steel Bridge Alliance

Red Cliff Arch Rehabilitation Project

Prize Bridge Information

  • Year Awarded: 2005
  • Year Completed: 2004
  • Location: Red Cliff, CO
  • Award Class: Reconstructed
  • Designer/EOR: Colorado Department of Transportation/Staff Bridge Branch
  • Fabricator: American Fabricators
  • Owner: Colorado Department of Transportation
  • General Contractor: Lawrence Construction Company
  • Detailer: American Fabricators

Structure Information

  • Structure Type: Arch
  • Coating System: Paint
  • Span Length (ft): 39/318/55/55
  • Structure Length (ft): 471
  • Average Deck Width (ft): 39
  • Steel Weight/Deck Area (lb/ft²): 65.4
  • Amount of Steel (tons): 594.5
  • Cost: $3.6 million