National Steel Bridge Alliance

Sam White Bridge

Prize Bridge Information

  • Year Awarded: 2012
  • Year Completed: 2011
  • Location: American Fork, UT
  • Designer/EOR: Michael Baker Jr., Inc.
  • Fabricator: Utah Pacific Bridge & Steel
  • Owner: Utah Department of Transportation
  • General Contractor: Provo River Constructors
  • Detailer: Intermountain Bridges Detailers

Structure Information

  • Structure Type: Plate Girder
  • Coating System: Paint
  • Span Length (ft): 177/177
  • Structure Length (ft): 354
  • Average Deck Width (ft): 76.8333
  • Steel Weight/Deck Area (lb/ft²): 38
  • Amount of Steel (tons): 523
  • Cost: $5.1 million