National Steel Bridge Alliance
Sam White Bridge
Prize Bridge Information
- Year Awarded: 2012
- Year Completed: 2011
- Location: American Fork, UT
- Designer/EOR: Michael Baker Jr., Inc.
- Fabricator: Utah Pacific Bridge & Steel
- Owner: Utah Department of Transportation
- General Contractor: Provo River Constructors
- Detailer: Intermountain Bridges Detailers
Structure Information
- Structure Type: Plate Girder
- Coating System: Paint
- Span Length (ft): 177/177
- Structure Length (ft): 354
- Average Deck Width (ft): 76.8333
- Steel Weight/Deck Area (lb/ft²): 38
- Amount of Steel (tons): 523
- Cost: $5.1 million