National Steel Bridge Alliance
Alexander Hamilton Bridge
Prize Bridge Information
- Year Awarded: 2016
- Year Completed: 2014
- Location: New York, NY
- Award Class: Reconstructed
- Designer/EOR: Jacobs
- Fabricator: Canam Groupe
- Owner: NYSDOT
- General Contractor: Halmar International
- Detailer: Canam Groupe
Structure Information
- Structure Type: Arch
- Coating System: Paint
- Span Length (ft): 84/85/546/82/136/129/127/127/111/110
- Structure Length (ft): 1527
- Average Deck Width (ft): 135
- Cost: $413 million