National Steel Bridge Alliance
Gateway Boulevard Bridge over the Cumberland River
Prize Bridge Information
- Year Awarded: 2005
- Year Completed: 2003
- Location: Hardy County, WV
- Award Class: Major Span
- Designer/EOR: HNTB Corporation
- Fabricator: PDM Bridge
- Owner: Tennessee Department of Transportation
- General Contractor: Ray Bell Construction Company
- Detailer: Tensor Engineering
- Architect: HNTB Corporation
Structure Information
- Structure Type: Arch
- Coating System: Paint
- Span Length (ft): 545/128/59
- Structure Length (ft): 1660
- Average Deck Width (ft): 102
- Steel Weight/Deck Area (lb/ft²): 83
- Amount of Steel (tons): 2950
- Cost: $31.5 million