National Steel Bridge Alliance

Lincoln Square Bellevue Way Skybridge

Prize Bridge Information

  • Year Awarded: 2007
  • Year Completed: 2005
  • Location: Bellevue, WA
  • Award Class: Special Purpose
  • Designer/EOR: Andersen Bjornstad Kane Jacobs (ABKJ)
  • Fabricator: Jesse Engineering
  • Owner: Kemper Development
  • General Contractor: Skanska USA Building
  • Detailer: Pacific Northwest Detailing
  • Architect: Sclater Partners Architects

Structure Information

  • Structure Type: Cable Stayed
  • Structure Length (ft): 107
  • Average Deck Width (ft): 11
  • Steel Weight/Deck Area (lb/ft²): 110
  • Amount of Steel (tons): 65
  • Cost: $1 million