National Steel Bridge Alliance
Lincoln Square Bellevue Way Skybridge
Prize Bridge Information
- Year Awarded: 2007
- Year Completed: 2005
- Location: Bellevue, WA
- Award Class: Special Purpose
- Designer/EOR: Andersen Bjornstad Kane Jacobs (ABKJ)
- Fabricator: Jesse Engineering
- Owner: Kemper Development
- General Contractor: Skanska USA Building
- Detailer: Pacific Northwest Detailing
- Architect: Sclater Partners Architects
Structure Information
- Structure Type: Cable Stayed
- Structure Length (ft): 107
- Average Deck Width (ft): 11
- Steel Weight/Deck Area (lb/ft²): 110
- Amount of Steel (tons): 65
- Cost: $1 million