National Steel Bridge Alliance
Murray Baker Bridge
Prize Bridge Information
- Year Awarded: 2007
- Year Completed: 2005
- Location: Peoria, IL
- Award Class: Reconstructed
- Designer/EOR: Alfred Benesch & Company
- Fabricator: Munsteel Steel Company, Inc.
- Owner: Illinois Department of Transportation
- General Contractor: Halverson Construction Company, Inc.
Structure Information
- Structure Type: Truss
- Coating System: Paint
- Span Length (ft): 165/2@180/240/2@450/600/420/4@120/85
- Structure Length (ft): 3250
- Average Deck Width (ft): 61
- Amount of Steel (tons): 24500
- Cost: $21 million