National Steel Bridge Alliance

New Croton Dam Spillway Bridge

Prize Bridge Information

  • Year Awarded: 2005
  • Year Completed: 2004
  • Location: Town of Cortlandt, NY
  • Award Class: Medium Span
  • Designer/EOR: Hardesty & Hanover, LLP
  • Fabricator: High Steel Structures, Inc.
  • Owner: New York City Department of Environmental Protection
  • General Contractor: Kiewit Constructors, Inc.
  • Detailer: Tensor Engineering

Structure Information

  • Structure Type: Arch
  • Coating System: Paint
  • Span Length (ft): 208
  • Structure Length (ft): 208
  • Average Deck Width (ft): 23.5
  • Steel Weight/Deck Area (lb/ft²): 102
  • Amount of Steel (tons): 250
  • Cost: $4.6 million