National Steel Bridge Alliance
New Croton Dam Spillway Bridge
Prize Bridge Information
- Year Awarded: 2005
- Year Completed: 2004
- Location: Town of Cortlandt, NY
- Award Class: Medium Span
- Designer/EOR: Hardesty & Hanover, LLP
- Fabricator: High Steel Structures, Inc.
- Owner: New York City Department of Environmental Protection
- General Contractor: Kiewit Constructors, Inc.
- Detailer: Tensor Engineering
Structure Information
- Structure Type: Arch
- Coating System: Paint
- Span Length (ft): 208
- Structure Length (ft): 208
- Average Deck Width (ft): 23.5
- Steel Weight/Deck Area (lb/ft²): 102
- Amount of Steel (tons): 250
- Cost: $4.6 million