National Steel Bridge Alliance
North Halsted Street Tied Arch Bridge
Prize Bridge Information
- Year Awarded: 2014
- Year Completed: 2011
- Location: Chicago, IL
- Award Class: Medium Span
- Designer/EOR: H. W. Lochner, Inc.
- Fabricator: Hillsdale Fabricators
- Owner: Chicago Department of Transportation - Division of Engineering
- General Contractor: Walsh Construction
- Detailer: Candraft Detailing, Inc.
Structure Information
- Structure Type: Arch
- Coating System: Weathering Steel
- Span Length (ft): 157
- Structure Length (ft): 268
- Average Deck Width (ft): 80
- Steel Weight/Deck Area (lb/ft²): 69
- Amount of Steel (tons): 434
- Cost: $13.7 million