National Steel Bridge Alliance

Pedestrian Bridge at the Yards Waterfront Park

Prize Bridge Information

  • Year Awarded: 2012
  • Year Completed: 2010
  • Location: Washington, DC
  • Award Class: Special Purpose
  • Designer/EOR: Robert Silman Associates
  • Fabricator: Banker Steel Company
  • Owner: Forest City Washington
  • General Contractor: Smoot Construction/P.J. Dick Incorporated Joint Venture
  • Detailer: WSP Mountain Enterprises
  • Architect: MPFP llc / M. Paul Friedberg & Partners

Structure Information

  • Coating System: Paint
  • Span Length (ft): 200
  • Structure Length (ft): 200
  • Average Deck Width (ft): 20
  • Steel Weight/Deck Area (lb/ft²): 115
  • Amount of Steel (tons): 190
  • Cost: $3 million