National Steel Bridge Alliance
South Layton Interchange SPUI
Prize Bridge Information
- Year Awarded: 2012
- Year Completed: 2010
- Location: Layton, UT
- Award Class: Short Span
- Designer/EOR: Michael Baker Jr., Inc.
- Owner: Utah Department of Transportation
- General Contractor: Ralph L. Wadsworth Construction Company, Inc.
- Detailer: Utah Pacific Bridge & Steel
Structure Information
- Coating System: Paint
- Span Length (ft): 108.8/106
- Structure Length (ft): 217.8
- Average Deck Width (ft): 163
- Steel Weight/Deck Area (lb/ft²): 24.2
- Amount of Steel (tons): 410
- Cost: $9.3 million