National Steel Bridge Alliance
Third Avenue Bridge
Prize Bridge Information
- Year Awarded: 2005
- Year Completed: 2005
- Location: New York City, NY
- Award Class: Movable Span
- Designer/EOR: Hardesty & Hanover, LLP
- Fabricator: G&G Steel, KiSKA Construction Corp.
- Owner: New York City Department of Transportation
- General Contractor: KiSKA Construction Corp.
- Detailer: Amec Zizka
- Architect: B. Thayer Associates
Structure Information
- Structure Type: Truss
- Coating System: Paint
- Span Length (ft): 350
- Structure Length (ft): 1500
- Average Deck Width (ft): 88
- Steel Weight/Deck Area (lb/ft²): 45
- Amount of Steel (tons): 3000
- Cost: $118.8 million