AISC
Bayou Sara Swing Bridge
Bayou Sara Swing Bridge
The swing span was over 90 years old and was scheduled to be replaced as part of a program to upgrade all of CSX’s movable bridges. Careful planning and pre-work paid off in the form of an accelerated swap-out of the swing spans, reducing the required track outage to only 14 hours.
Click here to learn more about this Prize Bridge Award-winning project.