AISC


Sarah Mildred Long Bridge

 

Sarah Mildred Long Bridge

The Sarah Mildred Long Bridge was designed with the lifting machinery and mechanical and electrical systems at the base of the tower, ensuring they could all be installed before completing tower erection and lift span float-in. This provided for quicker construction, lower initial costs, and easier access for future maintenance.

Click here to learn more about this Prize Bridge Award-winning project.