Connection Design Efficiency Loss [C7]

Prior to the detailing process begins, many projects with Delegated Connection Design, hit road blocks that derail the schedule early in the process. The connection design engineer is forced to send RFI's requesting essential information from the EOR so they can complete their design, which in turn, delays the detailing schedule and possibly the project. The end result is a project that is behind schedule with significant efficiency loss.


Intended Audience: Engineers, Fabricators, Erectors, Detailers
Track: Connections

  • Date: 4/11/2018 - 4/13/2018
  • PDH Credits: 0

SPEAKER(S)

David McBride, PE; David Wright, PE; Robert Johnson