Continuing Education

RFIs and the Waiting Game [L6]

On projects where every day counts, RFIs can easily chip away at the schedule, so reducing the need for RFIs can have a big impact. This session will provide tips on writing RFIs with the right information to limit the number of submitted RFIs and get information as soon as possible.


Intended Audience: Detailers, Engineers, Fabricators
Track:Design Analysis

  • Date: 4/3/2019 - 4/5/2019
  • PDH Credits: 0

SPEAKER(S)

Michael Herriges, PE

View content