Continuing Education

The Steel Advantage in Accelerated Bridge Construction [B6]

Owners are experiencing increasing constituent pressure to reduce construction time for infrastructure projects, increasing demand for Accelerated Bridge Construction (ABC). This session will look at case studies where steel was integral to project success.


Intended Audience: Detailers, Engineers, Erectors, Fabricators
Track:Bridges

  • Date: 4/3/2019 - 4/5/2019
  • PDH Credits: 0

SPEAKER(S)

Christian Ray, PE, PEng, PMP ; Mike Laviolette, PE, PEng ; Roger Eaton ; Jason Zang

View content