Continuing Education


The Use of NDT in the Rehabilitation of Major Steel Bridges: Two Case Studies

The webinar focuses on the rehabilitation of two major steel bridges, the Sherman Minton Bridge in Louisville and the Delaware River Bridge in Bristol, PA, each of which were rehabilitated and repaired using a combination of nondestructive testing, materials sampling and testing, engineering analysis, and emergency construction contracts. The two case studies show how major steel bridges can be quickly assessed and returned to service using a combination of tools.

  • Date: 10/22/2018
  • Time: 1:30 p.m. - 3:00 p.m. EDT
  • Duration: 1.5 hours
  • Location: Live Webinar
  • PDH Credits: 1.5
  • Cost:


    $185   AISC Member
    $155   Educator / Student / Government Agency
    $285   Non-Member

    Only one person from your organization is required to register per connection.  Each individual within your organization who attends at the registered connection will receive a PDH certificate at no additional charge.

  • Registration Deadline: 10/22/2018 10:00 a.m.
  • Substitutions and Cancellations: Substitutions may be made at any time. Cancellations received 1-3 days prior to the webinar will be charged a $50 service charge. Cancellations and no shows the day of the webinar session will not receive a refund.
  • Connection Instructions: Upon registration, you will receive a confirmation email containing your receipt, a link to access the webinar, dial-in audio instructions, and a link to a PDF handout of slides.

Speaker

Francesco Russo

Francesco Russo

Francesco M. Russo is founder and principal, Russo Structural Services.