Presentation Title |
Author |
Modular Steel Superstructures for Accelerated Bridge Construction - Iowa DOT Case Studies |
Norm McDonald - Iowa Department of Transportation |
Accelerated Steel Solution in the Heart of Iron Country |
Vincent Gastoni - Parsons, Kevin Western - Minnesota Department of Transportation |
Hot-Dip Galvanized Steel Use in Bridge Construction |
Tom Langill - American Galvanizers Association |
Long-Term Creep Performance of Metallized Faying Surfaces |
Charles-Darwin Annan - Laval University |
Three-Dimensional Finite Element Analysis Software for Steel Bridge Erection and Construction |
Paul Biju-Duval - University of Texas at Austin |
Rail Through-Plate Girder 3-D Analysis for Fundamental Evaluation of Knee Brace Behavior |
Duncan Paterson - HDR |
Challenging Skew: Higgins Road Steel I-Girder Bridge Over I-90 |
Brandon Chavel - HDR |
Kinked Straight Girders Forming Horizontally Curved Alignments on Northeast Anthony Henday Drive
|
Myles Lewis - Stantec Consulting Ltd. |
Case Studies of Complex Girder Erection
|
Andrew Keaschall, Hossam Abdou - Alfred Benesch and Company |
US 84 Mississippi River Bridge - Truss Pin and Link Replacement |
James Gregg - HNTB |
Using Fabrication and Metrology Advances withy Skewed and Curved Pre-Erected Mult Span Pedestrian Bridg |
Bob Cisneros - High Steel Structures |
Fracture Resilience and Redundancy of Built-Up Steel Girders |
Matt Hebdon - Virginia Tech |
Towards and Integrated Fracture Control Plan |
Ryan Sherman - Purdue University |
A Redundant Steel Truss Bridge for the City of Minneapolis |
Greg Hasbrouck, Martin Furrer - Parsons |
The Goethals Bridge Replacement |
Seth Condell |
Advancing the State of Practice in Steel Bridge Evaulation: Application of the Master Curve and Fitness-for-Service for Existing Structures
|
William Collins - University of Kansas |
Strengthening Continuous Steel Girder Bridges with Post-Installed Shear Connectors |
Kerry Kreitman - University of Texas at Austin |
Practical Implementation of Stability Bracing Strength and Stiffness Guidelines for Steel I-Girder Bridges |
Domenic Coletti - HDR |
FDOT's Criteria for Wind on Partially Constructed Bridges |
Dennis Golabek - Kisinger Campo & Associates, Christina Freeman - Florida Department of Transportation |
Reconstructing Chicago's Interchange by the Lake |
Chris Stine - AECOM |
Setting the Stage for Successful Resequencing of a Major River Bridge During Construction |
Shane Beabes - AECOM |
Design-Build of US 69 Bridge Over Missouri River |
Frank Blakemore - Garver |
Success with Steel: The I-25/Paseo del Norte Interchange Reconstruction Flyover |
Amanda White - New Mexico State University |
Bridge Over the Ter River in Girona Spain: Complex Simplicity |
Juan Sobrino, Javier Jordan - ICCP |
Steelwork Solutions with Modern Structural Shapes: European Trends in Steel Fabrication |
Riccardo Zanon - ArcelorMittal Europe |
Scanning, Plating and Heat Straightening, Oh My! |
Steve Olson - Olson & Nesvold Engineers |
Seismic Design of the Kentucky Lake and Lake Barkley Approach Spans |
Brad Robson, David Rust, Kyle McLemore - Palmer Engineering |
Lake Bridges Basket-Handle Network Tied Arch Superstructure Design |
Jason Stith, Chou-Yu Yong, Terrance Tiberio, Richard Schoedel - Michael Baker International |