National Steel Bridge Alliance

In This Section


2018 WSBS Conference Proceedings

Presentation Title Author
A Potential Framework for Exploiting the Benefits of High-Toughness Steel Ryan Sherman, PhD - University of Nevada, Las Vegas
Accelerated Bridge Construction of the Shore Line Bridge, Boston  Phineas Fowler, PE - Louis Berger
Advances in Design of Noncomposite Longitudinally Stiffened Steel Box Section Members for Bridge Construction Ajinkya Lokhande - Georgia Institute of Technology
An Overlooked Aspect of Accelerated Bridge Construction, Protecting the Forest on a Pedestrian Trail Patrick Gallagher - Parsons
BNSF Railroad Truss Bridge—Oklahoma City Sue Tryon, PE - Benham Design, LLC, Dennis Noernberg - W&W/AFCO Steel
Bridge Design and Economics Karl Svaty, PE, SE - MKEC Engr. Consl., Inc.
Bridge Topcoats in Japan: Toward a 100 Year Coating System Winn Darden - AGC Chemicals Americas
Broadway Bridge Tied Arches Natalie McCombs, PE - HNTB
Case Study of Long Span Steel Bridge Stability During Design And Construction Susan Steele - High Steel Structures, Kevin Sear, PE - AECOM
Construction of the Lewis and Clark Cable-Stayed Bridge over the Ohio River Marcos Loizias, PE - JACOBS
Delaware River Bridge Fracture: Repair Strategy and Monitoring by Digital Image Correlation Theodore Zoli, PE - HNTB Corporation, Ashley Thrall, PhD - University of Notre Dame
Delaware River Turnpike Bridge Fracture Repair Frank Corso, PE - New Jersey Turnpike Authority, Richard Schaefer, PE - HNTB Corporation
Design and Construction of Steel Transit Bridge Structures in the Context of a Large Design-Build Project Gregory Shafer, PE - Parsons, Ross Burhouse, PE - Dewberry
Designing and Constructing the Nation’s First Completely Stainless Steel Bolted Splice Jason Provines, PE - Virginia Department of Transportation
Distortion of Steel Plate Girders Due to Hot-Dip Galvanizing Caroline Bennett, PhD - University of Kansas

Extending Maximum Length of Folded Steel Plate Girder Bridge System to Beyond 100 ft

Atorod Azizinamini, PhD, PE - Florida International University
Fit-Up Considerations for Steel I-Girder Bridges Domenic Coletti, PE - HDR
Galvanic Corrosion of ASTM A1010 Steel Connected to Dissimilar Metals Isaac Groshek - AECOM
I15 Capitol/Cedar Interchange–Helena, MT Dustin Hirose, PE - HDR, Stephanie Brandenberger - MDT Bridge Bureau
Innovative Steel–Concrete Composite Solutions for Bridge Girders: Recent Developments / Implementation in Poland Riccardo Zanon - ArcelorMittal Europe
Inspection Intervals for Fracture—Critical Steel Bridges Based on Fatigue and Fracture Life-cycle Cost Assessment Hussam Mahmoud, PhD - Colorado State University
Launching Three Trusses over the BNSF Northtown Rail Yard Martin Furrer, PE, SE - Parsons
Navigation Modeling and Preliminary Design of the Smithland Bridge Taylor Perkins, PE, Tony Hunley, PhD, PE, SE - Stantec Consulting Services Inc
Nondestructive Testing and Materials Analysis of the PA/NJ Turnpike Connector Bridge Francesco Russo, PhD, PE - Michael Baker International, Thomas Murphy, PhD, PE - Modjeski & Masters
Polyaspartic Coatings: Reducing the Cost of Shop Painted Steel Bridges Through Improving Shop Painting Efficiency Ahren Olson - Covestro LLC, Ronnie Medlock, PE - High Steel Structures
Rehabilitation of Collision Damaged Beams Using Heat Straightening for  I-66 over Route 29 Alireza Hedayati, PE - WSP|Parsons Brinckerhoff
Replacement of the Historic Greenfield Bridge, Using Steel to Reflect the Past and Meet the Needs of Today Anthony Ream, PE - HDR, William Beining, PE - HDR
Replacing Saskatoon's Historic Parker Truss "Traffic Bridge" Murray Johnson, PE - COWI North America
Replacing the Aging US 52 Mississippi River Bridge Greg Hasbrouck, PE - Parsons
Sellwood Bridge Replacement Project Eric Rau, PE - T.Y. Lin International
Standard Manufacturable Steel Orthotropic Deck Solution Sougata Roy, PhD - Sougata Roy, LLC
Successful Installation of ABC Demonstration Project in Ohio Using SPS Bridge Decks Proposed MassDOT Rapid Short Span Bridge Replacement Rolando Moreau, M.Eng., P.Eng - SPS North America
The Benefits of Performing a Geometric Nonlinear Analysis for Curved Bridges During Erection Paul Biju-Duval - The University of Texas at Austin
The New Champlain Bridge Marwan  Nader, PhD, PE - T.Y. Lin International
The New Johnson Street Bridge-A Unique Bridge in a Unique Project Keith Griesing, PE - Hardesty & Hanover
Toronto Fort York Pedestrian Bridges—The First Duplex Stainless Steel Bridges in North America Juan Sobrino, PhD - PEDELTA
When Aesthetics Govern: Pedestrian Bridges and Architecturally Exposed Structural Steel Terri Boake - University of Waterloo